ALSEP long term operational planning : (interim)
ALSEP long term operational planning : (interim)
dc.contributor.author | Perkins, Derek. | |
dc.contributor.other | Fithian, D. | |
dc.date.accessioned | 2015-09-09T22:26:44Z | |
dc.date.available | 2015-09-09T22:26:44Z | |
dc.date.issued | 1973 | |
dc.description.abstract | The purpose of this analysis is to determine the optimum long term operational profile for the five ALSEP systems presently active on the moon. The main interest is centered on the turn-off sequence, for experiments and other commandable units, that gives the maximum scientific return from each ALSEP system by prudent use of the power remaining in the RTG. | |
dc.description.statementofresponsibility | prepared by D. Perkins ; approved by D. Fithian. | |
dc.description.tableofcontents | Introduction -- ALSEP assessment -- Recommendations | |
dc.format.extent | 60 leaves | |
dc.format.mimetype | application/pdf | |
dc.identifier.other | 31111000664035 | |
dc.identifier.uri | https://hdl.handle.net/20.500.11753/53 | |
dc.language.iso | en | |
dc.publisher | Bendix, Aerospace Systems Division | |
dc.source.uri | https://www.lpi.usra.edu/lunar/ALSEP/pdf/ALSEP%20%23140D-LngTrmOpsPlan.pdf | |
dc.subject.lcc | TL789.8.U6A5 | |
dc.subject.lcsh | Apollo Lunar Surface Experiments Package | |
dc.title | ALSEP long term operational planning : (interim) | |
dc.title.alternative | Apollo Lunar Surface Experiments Package long term operational planning | |
dc.type | Technical report |
Files
Original bundle
1 - 1 of 1
No Thumbnail Available
- Name:
- ALSEP #140D-LngTrmOpsPlan.pdf
- Size:
- 1.79 MB
- Format:
- Adobe Portable Document Format
- Description: