HFE power off during lunar night
HFE power off during lunar night
No Thumbnail Available
Date
1971
Authors
Smith, B. D.
Journal Title
Journal ISSN
Volume Title
Publisher
Bendix Corporation, Aerospace Systems Division
Abstract
This ATM responds to an MSC request that Bendix review the unscheduled operation of the HFE with power off during lunar night, provide an assessment of the low temperature to which the instrument was exposed and appraise the possible impairment of reliability.