A2 HFE DH15 anomaly investigation

dc.contributor.author Gilson, R.
dc.contributor.other Tosh, Warren M.
dc.date.accessioned 2015-09-09T22:26:48Z
dc.date.available 2015-09-09T22:26:48Z
dc.date.issued 1971
dc.description.abstract Since 219/10/27/56 EGMT, data from A2 Heat Flow Experiment probe 2 thermocouple reference bridge Channel DH15 (DH91=1110) has exhibited symptoms that indicate a possible failure within the HFE electronics. At the above time the electronics temperature had been stabilized for over four hours following the August 7th eclipse.
dc.description.statementofresponsibility prepared by R. Gilson ; approved by W. Tosh.
dc.format.extent 6 leaves
dc.format.mimetype application/pdf
dc.identifier.other 31111000664225
dc.identifier.uri https://hdl.handle.net/20.500.11753/71
dc.language.iso en
dc.publisher Bendix Corporation, Aerospace Systems Division
dc.relation.ispartofseries ALSEP technical memorandum
dc.source.uri https://www.lpi.usra.edu/lunar/ALSEP/pdf/A2%20HFE%20DH15%20Anomaly%20Investigation_ATM-1055.pdf
dc.subject.lcsh Apollo Lunar Surface Experiments Package
dc.subject.lcsh Lunar heat flow
dc.subject.lcsh Heat Flow Experiment
dc.title A2 HFE DH15 anomaly investigation
dc.title.alternative A2 Heat Flow Experiment DH15 anomaly investigation
Files
Original bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
A2 HFE DH15 Anomaly Investigation_ATM-1055.pdf
Size:
250.51 KB
Format:
Adobe Portable Document Format
Description:
Collections