LSPE interim stowage thermal constraints
LSPE interim stowage thermal constraints
dc.contributor.author | Toelle, Dan. | |
dc.date.accessioned | 2015-09-09T22:30:21Z | |
dc.date.available | 2015-09-09T22:30:21Z | |
dc.date.issued | 1971 | |
dc.description.abstract | This ATM provides an answer to Action Iten: 521, "BxA agreed that if explosive packages are exposed to the sun for 5 hours prior to each EVA, the 40° F timer requirement will be met. BxA to revise applicable ATM with analysis to prove the 5-hour requirement is suitable." In addition interim stowage constraints required for thermal integrity are defined. | |
dc.description.statementofresponsibility | prepared by Dan Toelle. | |
dc.format.extent | 12 leaves | |
dc.format.mimetype | application/pdf | |
dc.identifier.other | 31111000671121 | |
dc.identifier.uri | https://hdl.handle.net/20.500.11753/442 | |
dc.language.iso | en | |
dc.publisher | Bendix Aerospace Systems Division | |
dc.relation.ispartofseries | ALSEP technical memorandum ; 1080 | |
dc.source.uri | https://www.lpi.usra.edu/lunar/ALSEP/pdf/31111000671121.pdf | |
dc.subject.lcc | TL789.8.U6A5 | |
dc.subject.lcsh | Apollo Lunar Surface Experiments Package | |
dc.subject.lcsh | Lunar Seismic Profiling Experiment | |
dc.subject.other | Apollo 17 | |
dc.title | LSPE interim stowage thermal constraints | |
dc.title.alternative | Lunar Seismic Profiling Experiment interim stowage thermal constraints |
Files
Original bundle
1 - 1 of 1
No Thumbnail Available
- Name:
- 31111000671121.pdf
- Size:
- 446.01 KB
- Format:
- Adobe Portable Document Format
- Description: