LSPE interim stowage thermal constraints
LSPE interim stowage thermal constraints
No Thumbnail Available
Date
1971
Authors
Toelle, Dan.
Journal Title
Journal ISSN
Volume Title
Publisher
Bendix Aerospace Systems Division
Abstract
This ATM provides an answer to Action Iten: 521, "BxA agreed that if explosive packages are exposed to the sun for 5 hours prior to each EVA, the 40° F timer requirement will be met. BxA to revise applicable ATM with analysis to prove the 5-hour requirement is suitable." In addition interim stowage constraints required for thermal integrity are defined.