LRRR(300) acceptance test deployment sequence
LRRR(300) acceptance test deployment sequence
No Thumbnail Available
Date
1971
Authors
Geiss, H. W.
Journal Title
Journal ISSN
Volume Title
Publisher
Bendix Aerospace Systems Division
Abstract
The following deployment procedure is the Crew Engineering Acceptance Test Sequence for the LRRR(300) Trainer. This deployment sequence includes all the tasks and equipment manipulations that the astronauts will be required to perform with the LRRR(300) during training and on the lunar surface, with the exception of package removal tasks.