Preliminary test of the heat flow probe deployment

No Thumbnail Available
Date
1967
Authors
Marrus, Leslie D.
Journal Title
Journal ISSN
Volume Title
Publisher
Bendix Aerospace Systems Division
Abstract
This is an unscheduled ATM dealing with the test and evaluation of the Heat Flow Experiment Probe Assembly conducted by two BxA subjects (working in shirt sleeves) at the Mission and Crew Engineering test facility on 1 August 1967.
Description
Keywords
Citation
Collections