Final report ALSEP Boydbolt fastener design verification program preliminary dynamic tests

No Thumbnail Available
Date
1968
Authors
Foster, Robert.
Journal Title
Journal ISSN
Volume Title
Publisher
Bendix Aerospace Systems Division
Abstract
These preliminary dynamic tests were run subsequent to the Boydbolt static tests. The purpose was to (1) check out the revised installation technique (procedure 2. 33597 5, Revision C), (2.) examine the Boydbolt with the hardened spindles (CA 2.773-14-1) as compared with the regular bolt (CA 2773-14), and (3) further test the effect of Mylar insulation material on bolt preload.
Description
Keywords
Citation
Collections