Abstract:
Since 219/10/27/56 EGMT, data from A2 Heat Flow Experiment probe 2 thermocouple reference bridge Channel DH15 (DH91=1110) has exhibited symptoms that indicate a possible failure within the HFE electronics. At the above time the electronics temperature had been stabilized for over four hours following the August 7th eclipse.