USRA Houston Repository

Power Conditioner Unit operational conditions for maximum reliability

Show simple item record

dc.contributor.author Simonds, T. A.
dc.date.accessioned 2015-09-09T22:30:43Z
dc.date.available 2015-09-09T22:30:43Z
dc.date.issued 1969
dc.identifier.other 31111000672723
dc.identifier.uri https://hdl.handle.net/20.500.11753/585
dc.description.abstract During recent discussions on the operational modes of the EASEP Central Station, a question was directed to Reliability to assess the most reliable mode of PCU operation in that with the consideration that no failures having occurred during the first Lunar Day, switchover will automatically occur from Side l to Side 2 operation at the end of that Lunar Day.
dc.description.statementofresponsibility prepared by T. Simonds.
dc.format.extent 10 leaves
dc.format.mimetype application/pdf
dc.language.iso en
dc.publisher Bendix Aerospace Systems Division
dc.relation.ispartofseries EATM
dc.source.uri https://www.lpi.usra.edu/lunar/ALSEP/pdf/31111000672723.pdf
dc.subject.lcc TL789.8.U6A5
dc.subject.lcsh Early Apollo Scientific Experiments Package
dc.subject.lcsh Electric power
dc.subject.lcsh Power electronics
dc.title Power Conditioner Unit operational conditions for maximum reliability


Files in this item

This item appears in the following Collection(s)

  • ALSEP Documents
    Apollo Lunar Surface Experiment Package (ALSEP) Documents

Show simple item record

Search HOU Repository


Browse

My Account