Power Conditioner Unit operational conditions for maximum reliability

No Thumbnail Available
Date
1969
Authors
Simonds, T. A.
Journal Title
Journal ISSN
Volume Title
Publisher
Bendix Aerospace Systems Division
Abstract
During recent discussions on the operational modes of the EASEP Central Station, a question was directed to Reliability to assess the most reliable mode of PCU operation in that with the consideration that no failures having occurred during the first Lunar Day, switchover will automatically occur from Side l to Side 2 operation at the end of that Lunar Day.
Description
Keywords
Citation
Collections