Abstract:
This memorandum presents the current inventory of commands applicable to the Passive Seismic Experiment Package. This revision reflects changes in the initial functional mode of the equipment as it is delivered to the lunar surface. This initial operating mode is specified in the PSEP Preliminary Operations Plan (EATM-38).