Abstract:
This revision A is to provide the LMS project group with additional data requested of them during the QTRR 5/17/72. Included are additional thermocouple data on the program sweep high voltage, low voltage power supply, and multiplier tubes high voltage cards obtained during the LMS Design Verification Test of 9/30/71.