USRA Houston Repository

Spurious status changes in Array E

Show simple item record

dc.contributor.author Thomas, D. J.
dc.date.accessioned 2015-09-09T22:30:37Z
dc.date.available 2015-09-09T22:30:37Z
dc.date.issued 1972
dc.identifier.other 31111000672319
dc.identifier.uri https://hdl.handle.net/20.500.11753/545
dc.description.abstract During the C/S Verification Test (TP 2.368960) on the Array E Qualification Model, several changes of status occurred at turn-on, PC changeover or following other power interruptions. These discrepancies were documented in DR AC 5068, 5069, 5071, 5072., and 5082. This report documents the analysis of these anomalies, and discusses possible design changes to eliminate the discrepant operation.
dc.description.statementofresponsibility prepared by D. J. Thomas.
dc.description.tableofcontents Introduction -- DR AC 5068. Change from DP Formatting to LSPE Formatting following Octal Command 110 -- DR AC 5069. APM Came Up in "Off" State at Turn-On (HK-76) -- DR AC 5071. Uplink Switch Delay Status Changed to "Delayed" at PC Changeover (HK-01) -- DR AC 5072. Experiment /12 Changed from "Standby" to "Off" at PC Changeover (HK-12) -- DR AC 5082. Experiment /12 Changed Spontaneously From "On" to "Standby", and From "Standby" to "Off" -- General Discussion -- Summary and Recommendations
dc.format.extent 20 leaves
dc.format.mimetype application/pdf
dc.language.iso en
dc.publisher Bendix Aerospace Systems Division
dc.relation.ispartofseries ALSEP technical memorandum ; 1096.
dc.source.uri https://www.lpi.usra.edu/lunar/ALSEP/pdf/31111000672319.pdf
dc.subject.lcc TL789.8.U6A5
dc.subject.lcsh Apollo Lunar Surface Experiments Package
dc.title Spurious status changes in Array E


Files in this item

This item appears in the following Collection(s)

  • ALSEP Documents
    Apollo Lunar Surface Experiment Package (ALSEP) Documents

Show simple item record

Search HOU Repository


Browse

My Account