USRA Houston Repository

Grenade transmitter operational verification tests

Show simple item record

dc.contributor.author Tupman, J.
dc.date.accessioned 2015-09-09T22:30:34Z
dc.date.available 2015-09-09T22:30:34Z
dc.date.issued 1966
dc.identifier.other 31111000672137
dc.identifier.uri https://hdl.handle.net/20.500.11753/527
dc.description.abstract This is an unscheduled ATM covering the Grenade Transmitter Operational Verification Tests. Using the proposed Grenade Launch Assembly (G. L.A.) Test Set, it will be possible to furnish power to the grenade transmitters when they are installed in the G. L. A. package and check for functional operation.
dc.description.statementofresponsibility prepared by J. Tupman.
dc.format.extent 1 leaf
dc.format.mimetype application/pdf
dc.language.iso en
dc.publisher Bendix Aerospace Systems Division
dc.relation.ispartofseries ALSEP technical memorandum ; 472.
dc.source.uri https://www.lpi.usra.edu/lunar/ALSEP/pdf/31111000672137.pdf
dc.subject.lcc TL789.8.U6A5
dc.subject.lcsh Apollo Lunar Surface Experiments Package
dc.subject.lcsh Grenade launchers
dc.title Grenade transmitter operational verification tests


Files in this item

This item appears in the following Collection(s)

  • ALSEP Documents
    Apollo Lunar Surface Experiment Package (ALSEP) Documents

Show simple item record

Search HOU Repository


Browse

My Account