Abstract:
This is an unscheduled ATM covering the Grenade Transmitter Operational Verification Tests. Using the proposed Grenade Launch Assembly (G. L.A.) Test Set, it will be possible to furnish power to the grenade transmitters when they are installed in the G. L. A. package and check for functional operation.