USRA Houston Repository

Investigation of Flight II Central Station overvoltage condition

Show simple item record

dc.contributor.author Mansour, John.
dc.date.accessioned 2015-09-09T22:27:13Z
dc.date.available 2015-09-09T22:27:13Z
dc.date.issued 1968
dc.identifier.other 31111000666873
dc.identifier.uri https://hdl.handle.net/20.500.11753/203
dc.description.abstract The purpose of this ATM is to document the results of the Reliability/Engineering investigation of the overvoltage condition that occurred while performing the Flight II Central Station power dissipation test. The objective was to assess the flight worthiness of the C/S components and to identify any overstressed piece parts.
dc.description.statementofresponsibility prepared by J. Mansour.
dc.format.extent 14 leaves
dc.format.mimetype application/pdf
dc.language.iso en
dc.publisher Bendix Aerospace Systems Division
dc.relation.ispartofseries ALSEP technical memorandum
dc.source.uri https://www.lpi.usra.edu/lunar/ALSEP/pdf/ALSEP%20%23289%20-%20Invest_Flight%20II%20CS%20Overvoltage%20Condition_ATM%20800.pdf
dc.subject.lcc TL789.8.U6A5
dc.subject.lcsh Apollo Lunar Surface Experiments Package
dc.subject.lcsh Overvoltage
dc.title Investigation of Flight II Central Station overvoltage condition


Files in this item

This item appears in the following Collection(s)

  • ALSEP Documents
    Apollo Lunar Surface Experiment Package (ALSEP) Documents

Show simple item record

Search HOU Repository


Browse

My Account