Abstract:
The purpose of this ATM is to document the results of the Reliability/Engineering investigation of the overvoltage condition that occurred while performing the Flight II Central Station power dissipation test. The objective was to assess the flight worthiness of the C/S components and to identify any overstressed piece parts.