USRA Houston Repository

Crew engineering tests for handling of the Active Seismic Experiment during deployment

Show simple item record

dc.contributor.author Micocci, Angelo J.
dc.date.accessioned 2015-09-09T22:27:06Z
dc.date.available 2015-09-09T22:27:06Z
dc.date.issued 1967
dc.identifier.other 31111000666188
dc.identifier.uri https://hdl.handle.net/20.500.11753/156
dc.description.abstract This is an unscheduled ATM which delineates and describes Crew Engineering test objectives, hardware to be used, and the alternate methods to be employed in determining the optimum method for retrieval and handling of the Mortar Box Assembly during deployment of the Active Seismic Experiment.
dc.description.statementofresponsibility prepared by Angelo J. Micocci.
dc.format.extent 6 leaves
dc.format.mimetype application/pdf
dc.language.iso en
dc.publisher Bendix Aerospace Systems Division
dc.relation.ispartofseries ALSEP technical memorandum
dc.source.uri https://www.lpi.usra.edu/lunar/ALSEP/pdf/ALSEP%20%23217%20-%20Crew%20Eng%20Test_ASE_ATM%20716.pdf
dc.subject.lcc TL789.8.U6A5
dc.subject.lcsh Apollo Lunar Surface Experiments Package
dc.subject.lcsh Active Seismic Experiment (Instrument)
dc.subject.lcsh Seismology--Experiments
dc.title Crew engineering tests for handling of the Active Seismic Experiment during deployment


Files in this item

This item appears in the following Collection(s)

  • ALSEP Documents
    Apollo Lunar Surface Experiment Package (ALSEP) Documents

Show simple item record

Search HOU Repository


Browse

My Account