Abstract:
This is an unscheduled ATM providing the results of a shirt sleeve test performed in the Bendix Mission and Crew Laboratory. The purpose of the test was to determine if shortening of the aided assist boom arm would affect the clearance between the ALSEP packages and the Landing Radar Antenna.