dc.contributor.author |
Douthat, D. Z. |
|
dc.contributor.author |
Neau, O. T. |
|
dc.contributor.author |
Tosh, Warren M. |
|
dc.date.accessioned |
2015-09-09T22:27:03Z |
|
dc.date.available |
2015-09-09T22:27:03Z |
|
dc.date.issued |
1968 |
|
dc.identifier.other |
31111000665982 |
|
dc.identifier.uri |
https://hdl.handle.net/20.500.11753/137 |
|
dc.description.abstract |
This ATM summarizes the conditions which led to the ALSEP Central Station Discrepancy Report AA 7344 and analyzes the results of trouble shooting steps performed to isolate and define the anomaly. Recommendations are made regarding proper operational procedures. |
|
dc.description.statementofresponsibility |
prepared by D. Douthat, O. Neau, W. Tosh. |
|
dc.format.extent |
9 leaves |
|
dc.format.mimetype |
application/pdf |
|
dc.language.iso |
en |
|
dc.publisher |
Bendix Aerospace Systems Division |
|
dc.relation.ispartofseries |
ALSEP technical memorandum |
|
dc.source.uri |
https://www.lpi.usra.edu/lunar/ALSEP/pdf/ALSEP%20%23259%20-%20CSPowerSwitchCharacteristics_ATM%20740.pdf |
|
dc.subject.lcc |
TL789.8.U6A5 |
|
dc.subject.lcsh |
Apollo Lunar Surface Experiments Package |
|
dc.subject.lcsh |
Switching power supplies |
|
dc.title |
Central Station power switching characteristics |
|