USRA Houston Repository

Browsing by Author "Neau, O. T."

Browsing by Author "Neau, O. T."

Sort by:Order:Results:

  • Neau, O. T. (Bendix Aerospace Systems Division, 1969)
    This issue of the ALSEP power budget provides the information available at the beginning of January 1969 on the power requirements of the major ALSEP components and the resulting composite system power usage for the ...
  • Neau, O. T. (Bendix Aerospace Systems Division, 1970)
    This issue of the ALSEP power budget provides the information available at the end of November 1970 on the power requirements of the major ALSEP components and the resulting composite system power usage for the deliverable ...
  • Neau, O. T. (Bendix Systems Division, 1966)
    The Block 3 Operations Plan was originally scheduled for publication on 20 October 1966. However, as no significant changes have occurred since the publication of the Block 2 Operations Plan, ATR-18 dated 12 September 1966, ...
  • Douthat, D. Z.; Neau, O. T.; Tosh, Warren M. (Bendix Aerospace Systems Division, 1968)
    This ATM summarizes the conditions which led to the ALSEP Central Station Discrepancy Report AA 7344 and analyzes the results of trouble shooting steps performed to isolate and define the anomaly. Recommendations are made ...
  • Neau, O. T. (Bendix Aerospace Systems Division, 1969)
    This command list, applicable to Flight Models 1, 3 and 4 of ALSEP, supersedes previous editions. Flight Model #2 has been allocated for use in the EASEP program, commands for which are defined in EATM-4 (Rev. A) dated 1 ...
  • Neau, O. T. (Bendix Aerospace Systems Division, 1968)
    The major equipment constraints on the ALSEP deployment sequence are defined and basic background material for the constraints is presented.
  • Neau, O. T. (Bendix Systems Division, 1966)
    This ATM documents Task 2 of the Operational Contingency Study defined in ATM-396. Diagnostic procedures have been described for the Operational Contingencies defined in ATM-529. Purpose of the diagnostic procedures is to ...
  • Neau, O. T. (Bendix Systems Division, 1966)
    This ATM documents Task 1 of the Operational Contingency Study defined in ATM-396. Major functional failure modes for the ALSEP Central Station and for each experiment (both Array A and Array B) have been tabulated. The ...
  • Neau, O. T. (Bendix Aerospace Systems Division, 1967)
    This memorandum summarizes some of the trade-off considerations necessary in the design of a direct radiator for the ALSEP central station, utilizing second surface mirrors. Recommendations for a baseline design are derived.
  • Neau, O. T.; Wright, K. (Bendix Aerospace Systems Division, 1968)
    Within prescribed constraints, meaningful functional and performance testing of ALSEP can be effected after installation on the launch vehicle. Such testing could provide increased confidence of mission success in the event ...

Search HOU Repository

Browse

My Account