USRA Houston Repository

Browsing by Issue Date

Browsing by Issue Date

Sort by:Order:Results:

  • Lanning, H. E. (Bendix Systems Division, 1966)
    This ATM determines the probability of sync, false sync, and the probability of loosing sync for an 11 bit and 6 bit frame sync code. The number of bits/frame range from 1344 to 4032. The amount of data lost during loss ...
  • McCartin, L. (Bendix Systems Division, 1966)
    This ATM covers the justification for the 85 foot antenna and complies to Action Items B011404 and B011413.
  • Perkins, Derek. (Bendix Systems Division, 1966)
    This ATM defines the electrical interfaces, both internal and external, for each experiment.
  • Sondeen, P. (Bendix Systems Division, 1966)
    This report covers an investigation of cable and connector requirements for components of ALSEP subsystems.
  • Perkins, Derek. (Bendix Systems Division, 1966)
    This revision details changes to Revisions C and D of ATM-483.
  • Unknown author (Bendix Systems Division, 1966)
    As a result of a design meeting held Monday 25 April between G. Burton, L. McCartin and cognizant PE's and subsequent discussions the following design decisions were reached. All of the mandatory Block II changes should ...
  • Zimmer, J. (Bendix Systems Division, 1966)
    This ATM is written in response to Action Item B6-0805-5B requesting Bendix to evaluate the Stanford proposed data format.
  • Lewis, John F. (Bendix Systems Division, 1966)
    This ATM presents the scope of information and its format to be included in the ALSEP System Orientation Manual (4-Hour Course).
  • Tormohlen, D. P. (Bendix Systems Division, 1966)
    Technically, the SIDE PI is concerned that the SIDE be set on the lunar surface on its legs and not on the body of the package for thermal reasons and avoidance of dust contamination.
  • Johnson, W. E. (Bendix Systems Division, 1966)
    This ATM is submitted to comply with Action Item B6-0721-12B, Herbert to Kemiey. This item was assigned during the MSC meeting of 21-July-66 held at The Bendix Systems Division, Ann Arbor, Michigan. "Bendix Systems to ...
  • Johnson, W. E. (Bendix Systems Division, 1966)
    This ATM is submitted to comply with Action Item B6-0721-14B, W. E. Johnson to G. Kenney. This item was assigned during the MSC meeting of 21-July-66 held at The Bendix Systems Division, Ann Arbor, Michigan." Bendix System ...
  • Perkins, Derek. (Bendix Systems Division, 1966)
    This ATM defines the electrical interfaces, both internal and external, for each experiment.
  • Douthat, D. Z. (Bendix Systems Division, 1966)
    This memorandum defines the manner in which central station heaters, power dumps and experiment standby are to be arranged. The five switched central station heaters are replaced by two switched power dumps.
  • Perkins, Derek. (Bendix Systems Division, 1966)
    This revision details changes to Revision C of ATM-483.
  • Murtaugh, Clyde R. (Bendix Systems Division, 1966)
    These three items constitute the ALSEP equipment as it interfaces with the LEM.
  • Tupman, J. (Bendix Systems Division, 1966)
    This ATM is in response to RFC 117-18 and defines the changes to the Active Seismic Experiment Sensor Simulator in order to provide for a one point functional check of the Active Seismic Experiment Geophone Amplifier, ...
  • Tupman, J. (Bendix Aerospace Systems Division, 1966)
    This is an unscheduled ATM covering the Grenade Transmitter Operational Verification Tests. Using the proposed Grenade Launch Assembly (G. L.A.) Test Set, it will be possible to furnish power to the grenade transmitters ...
  • Collins, W. (Bendix Systems Division, 1966)
    The unscheduled ATM covers the functional description of the Data Processor.
  • Unknown author (Bendix Corporation, Bendix Systems Division, 1966)
    This specification defines the performance interface, and design requirements for the Apollo Lunar Surface Experiment Package (ALSEP).
  • Neau, O. T. (Bendix Systems Division, 1966)
    The Block 3 Operations Plan was originally scheduled for publication on 20 October 1966. However, as no significant changes have occurred since the publication of the Block 2 Operations Plan, ATR-18 dated 12 September 1966, ...

Search HOU Repository

Browse

My Account