USRA Houston Repository

Browsing by Issue Date

Browsing by Issue Date

Sort by:Order:Results:

  • Parker, Everette. (Bendix Systems Division, 1966)
    This report describes the latest estimate from Ames Research Center (ARC) of the magnetometer power profile.
  • Pressly, C. P. (Bendix Systems Division, 1966)
    This ATM presents the failure rate modifiers to be used for various types of ALSEP equipment during those mission phases from launch through deployment.
  • Wilson, H. W. (Bendix Systems Division, 1966)
    This document illustrates the detailed variations in the operational load of the subsystems of ALSEP. This information has been generated in response to Action Item B5-0712-20B which resulted from System PDR Change No 13-12.
  • Hutton, V. E. (Bendix Systems Division, 1966)
    This ATM is in response to Action Item B6-0721-10B and summarizes the schedule dates regarding investigation of the alternate antenna pointing concept. This information was requested by Gerke at the July Monthly Review, ...
  • Gilham, A. W. S.; Ahlstrom, C. W. (Bendix Systems Division, 1966)
    This is a preliminary analysis of ALSEP system test requirements and some recommendations for acceptance testing of the ALSEP system at BxS and KSC.
  • Gilham, A. W. S. (Bendix Systems Division, 1966)
    This ATM defines the acceptance techniques and limits to be used during ALSEP system tests at BASD and KSC.
  • Honeycutt, R.; Coleman, C. W. (Bendix Systems Division, 1966)
    This ATM is a statement of the magnetometer processing currently included in the DPS 2000 computer programs being written for the ALSEP System Test Set.
  • Douthat, D. Z. (Bendix Systems Division, 1966)
    Five of the sixteen channels of the analog multiplexer in the Active Seismic data processor have been as signed for central station measurements. These five will be the only telemetry on the central station during Active ...
  • Douthat, D. Z. (Bendix Systems Division, 1966)
    This memo recommends that 4 or 5 central station events be packed into a single analog channel and shows a simple method for doing this.
  • Douthat, D. Z. (Bendix Systems Division, 1966)
    Revised schedule for Operational Contingency Study.
  • Lewis, L. R. (Bendix Systems Division, 1966)
    The attached table gives a current listing of the electrical interconnections between the experiments and ALSEP supporting subsystems. Table 1 summarizes the electrical power lines and Table 2, the data, command, timing ...
  • Hendrickson, J. E. (Bendix Systems Division, 1966)
    This is an unscheduled ATM describing changes in the ALSEP Antenna Assembly Specification.
  • Reinhold, H. (Bendix Systems Division, 1966)
    This ATM describes the design approach relative to experiment Power Line Protection.
  • Neau, O. T. (Bendix Systems Division, 1966)
    This ATM documents Task 1 of the Operational Contingency Study defined in ATM-396. Major functional failure modes for the ALSEP Central Station and for each experiment (both Array A and Array B) have been tabulated. The ...
  • McNaughton, J. L. (Bendix Systems Division, 1966)
    This ATM contains material on the comparative analysis and design of the ALSEP Fuel Cask Thermal Shield. This report is submitted in accordance with MSC request generated during the System Preliminary Design Review of 12 ...
  • Perkins, Derek. (Bendix Systems Division, 1966)
    This memorandum provides the information made available by the experiments since the issue of Revision A.
  • Sahadi, G. (Bendix Systems Division, 1966)
    This ATM is a preliminary list of test parameters that will be checked for the ALSEP Data Subsystem components and integrated sub-system using the GSE Data Subsystem Test Set. The list is intended to be used in arriving ...
  • Fahling, W. (Bendix Systems Division, 1966)
    This ATM answers Action Item B020107 which requests backup data for not transmitting engineering (housekeeping) data during the Active Seismic Mode.
  • Whiteford, James E. (Bendix Systems Division, 1966)
    In response to Action Item B051301, the following is a statement of Bendix objectives for the proposed test and the dates of availability of the various hardware configurations.
  • Sondeen, P. (Bendix Systems Division, 1966)
    This report contains a list of electronic common parts which are recommended for application in ALSEP equipment.

Search HOU Repository

Browse

My Account